Baggage problems at Heathrow’s T5- A typical british cock-up

The BBC reported that many flights were cancelled on the first day of the public opening of Heathrow’s Terminal 5.

This was because of serious technical problems in the baggage handling system operated by British Airways meant that 34 flights were cancelled and several others were departing with hand luggage only.

How embarrassing for Britain. This major airport terminal costed around £4.3billion, and only got built after people living around Heathrow failed in a long-running campaign to stop it going up in the first place.

It’s yet another official cock-up…. a typical British cock-up.

UPDATE: The situation’s getting worse…..

Comments are closed.